1. Skip to Content
  2. Skip to Main Navigation
  3. Call Us

APWA Color Codes for Utilities
Blue
– Potable Water
Purple – Reclaimed Water, Irrigation and Slurry Lines
Pink – Temporary Survey Markings
Red – Electric Power Lines, Cable, Conduit and Lighting Cables
Yellow – Gas, Oil, Stream, Petroleum or Gaseous Materials
Orange – Communication, Alarm or Signal Lines, Cables or Conduit
Green – Sewers and Drain lines
(White) – Proposed Excavation
 
Working Subsurface
Call Sunshine State One-Call of Florida at 1-800-432-4770 at lease 48 hours before you dig but not more than 5 days. Have the following information ready when calling:
 
Company Name,
Address,
Contact Person,
Phone Number,
Location of Dig Site,
Extent and Type of Work, and
Date and Time of Excavation
 
Wait 48 hours for underground facilities to be marked.
 
Respect and protect the facility operator’s marks.
 
Dig with care! Always hand dig when within two feet, on either side, of any marked lines.
 
Relevant Permitting
Work in the City's right-of-way may need to be permitted. Contact the Community Services/IT Director or at 727-595-4646 ext. 123 to discuss any such work.

Please print the Right-of-Way Utilization Permit and hand deliver/mail the permit to the following address.

City of Belleair Beach
Peter Cavalli, MPA
Community Services/IT Director
444 Causeway Blvd
Belleair Beach, FL 33786

Work that disturbs soils may require a stormwater permit. Contact the Code Improvement Officer to discuss any such work.